RIN Data

FERC RIN: 1902-AF07 Publication ID: Fall 2016 
Title: Revised Critical Infrastructure Protection Reliability Standards 
Abstract:

In Order No. 822, the Commission approved seven critical infrastructure protection (CIP) Reliability Standards: CIP-003-6 (Security Management Controls), CIP-004-6 (Personnel and Training), CIP-006-6 (Physical Security of BES Cyber Systems), CIP-007-6 (Systems Security Management), CIP-009-6 (Recovery Plans for BES Cyber Systems), CIP-010-2 (Configuration Change Management and Vulnerability Assessments), and CIP-011-2 (Information Protection).  The proposed Reliability Standards address the cybersecurity of the bulk electric system and improve upon the current Commission-approved CIP Reliability Standards.  In addition, the Commission directed NERC to develop certain modifications to improve the CIP Reliability Standards.  In Order No. 829, the Commission directed the North American Electric Reliability Corporation to develop a new or modified Reliability Standard that addresses supply chain risk management for industrial control system hardware, software, and computing and networking services associated with bulk electric system operations. The new or modified Reliability Standard is intended to mitigate the risk of a cybersecurity incident affecting the reliable operation of the Bulk-Power System (Docket Nos. RM15-14-000 and RM15-14-002).

 
Agency: Federal Energy Regulatory Commission(FERC)  Priority: Substantive, Nonsignificant 
RIN Status: Previously published in the Unified Agenda   Agenda Stage of Rulemaking: Long-Term Actions 
Major: No  Unfunded Mandates: No 
CFR Citation: 18 CFR 40   
Legal Authority: 16 U.S.C. 824o   
Legal Deadline:  None
Timetable:
Action Date FR Cite
NPRM  07/22/2015  80 FR 43354   
NPRM Comment Period End  09/21/2015 
Notice of Technical Conference  11/04/2015  80 FR 68317   
Supplemental Notice  12/30/2015  80 FR 81534   
Supplemental Notice  01/04/2016  81 FR 87   
Final Rule, Order No. 822  01/26/2016  81 FR 4177   
Notice Granting Extension of Time  02/25/2016 
Order Granting Rehearing for Further Consideration  03/21/2016 
Order Denying Rehearing, Order No. 822-A  07/21/2016 
Final Rule, Order No. 829  07/29/2016  81 FR 49878   
Final Rule Effective  09/27/2016 
Next Action Undetermined  To Be Determined 
Regulatory Flexibility Analysis Required: No  Government Levels Affected: None 
Included in the Regulatory Plan: No 
RIN Data Printed in the FR: No 
Agency Contact:
Kevin Ryan
Legal Information, Office of the General Counsel
Federal Energy Regulatory Commission
888 First Street NE,
Washington, DC 20426
Phone:202 502-6840
Email: kevin.ryan@ferc.gov

Simon Slobodnik
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street NE.,
Washington, DC 20426
Phone:202 502-6707
Email: simon.slobodnik@ferc.gov

Daniel Phillips
Technical Information, Office of Electric Reliability
Federal Energy Regulatory Commission
888 First Street NE.,
Washington, DC 20426
Phone:202 502-6387
Email: daniel.phillips@ferc.gov